ICC & deputy soils inspection
Every foundation starts with verified ground.
Before a footing is poured, our ICC-certified deputy inspectors confirm the ground beneath it has been prepared, compacted and excavated exactly as the geotechnical report requires, so the structure rests on soil that has been tested, not assumed.

ICC-certified deputy inspectors
Checked against the soils report
Grading through footing sign-off
Photo-documented reports

What we verify
Checked on site, before it’s covered.
Each lift and excavation is checked against the geotechnical report and approved plans, then photographed and logged before work moves on.
- Site clearing & over-excavation01
- Fill material & lift thickness02
- Compaction testing03
- Footing excavation depth & width04
- Bearing material verification05
- Subgrade before slab pours06
- Retaining wall backfill & drainage07
How it works
Four steps, one certified inspector.
- 01
Initial consultation
We learn your project scope, site conditions and inspection requirements, and assign the right certified inspector from day one.
- 02
Site assessment & planning
We review documents, permits and applicable codes before arriving on site, so every visit is thorough and targeted.
- 03
Certified inspection & testing
A comprehensive on-site evaluation of every structural, safety and compliance checkpoint, using advanced diagnostic tools.
- 04
Detailed reporting
A clear, photo-documented report of findings, flagged issues and recommended corrective actions.