ICC fireproofing inspection
Fire protection, measured where it counts.
Sprayed fire-resistive materials and intumescent coatings only perform at the thickness, density and bond they were rated at. Our ICC-certified inspectors measure each one on site, so the structure keeps the fire rating it was designed for.

SFRM & intumescent coatings
Thickness, density & adhesion
Fire-code compliance
Photo-documented reports

What we verify
Checked on site, before it’s covered.
Readings are taken where the rating depends on them, at members, connections and penetrations, and logged against the approved fire-resistive design.
- Surface preparation01
- Approved product & rated assembly02
- SFRM thickness03
- Density testing04
- Bond strength05
- Intumescent coating thickness06
- Coverage at connections07
- Repairs after other trades08
How it works
Four steps, one certified inspector.
- 01
Initial consultation
We learn your project scope, site conditions and inspection requirements, and assign the right certified inspector from day one.
- 02
Site assessment & planning
We review documents, permits and applicable codes before arriving on site, so every visit is thorough and targeted.
- 03
Certified inspection & testing
A comprehensive on-site evaluation of every structural, safety and compliance checkpoint, using advanced diagnostic tools.
- 04
Detailed reporting
A clear, photo-documented report of findings, flagged issues and recommended corrective actions.
More ICC special inspections

ICC fireproofing inspection
Schedule an inspection.
Tell us about the project and your timeline. We confirm your appointment within 24 hours.